部分内容截图:
内容索引:
<A>
A MECHANICAL UNIT EXTERNAL DIMENSIONS
AND OPERATING SPACE......................................21
AIR SUPPLY AND EE(RI) INTERFACE (OPTION) ..54
Angle of Mounting Surface Setting..................................8
Applying the Grease of the Wrist Input Gear and Drive
Shaft (M-1iA/0.5S/0.5A/0.5SL/0.5AL) (6 months
(1920 Hours) Checks).................................................71
<B>
BASIC SPECIFICATIONS ...........................................15
<C>
CAMERA CABLE (OPTION).......................................59
Check and clean the joint cover (OPTION) ...................66
CHECK POINTS ...........................................................64
Check the Connectors ....................................................67
CHECKS AND MAINTENANCE ................................60
Cleaning the Wrist Axis Rotation Parts and the Wrist
Gears (M-1iA/0.5S/0.5A/0.5SL/0.5AL) .....................66
Confirmation of Oil Seepage and Oil Accumulation .....64
Confirmation of the Air Control Set (option).................65
CONNECTION WITH THE CONTROLLER...............12
<D>
Daily Checks..................................................................60
<E>
END EFFECTOR INSTALLATION TO WRIST .........48
EQUIPMENT INSTALLATION TO THE ROBOT......48
<I>
INSTALLATION.............................................................3
INSTALLATION CONDITIONS..................................11
<J>
JOINT COVER (OPTION) ............................................52
<L>
LOAD SETTING...........................................................50
<M>
MAINTENANCE ..........................................................68
MAINTENANCE AREA...............................................11
MASTERING ................................................................73
MASTERING DATA ENTRY ......................................86
MOUNTING BOLT TORQUE LIST ..........................102
<O>
OVERVIEW ..................................................................73
<P>
Periodic Checks and Maintenance .................................61
PERIODIC MAINTENANCE TABLE..........................99
PIPING AND WIRING TO THE END EFFECTOR.....53
PREFACE.................................................................... p-1
<Q>
QUICK MASTERING...................................................79
QUICK MASTERING FOR SINGLE AXIS.................81
<R>
Replacing the Batteries (1-Year (3840 Hours) Checks
(With Stand/No Stand B)) (1.5-Year (5760 Hours)
Checks (No Stand A)) ................................................68
RESETTING ALARMS AND PREPARING FOR
MASTERING.............................................................74
Retightening the Link B.................................................65
ROBOT CONFIGURATION.........................................15
<S>
SAFETY PRECAUTIONS ...........................................s-1
SINGLE AXIS MASTERING .......................................83
STORAGE .....................................................................72
<T>
TRANSPORTATION......................................................1
TRANSPORTATION AND INSTALLATION...............1
TROUBLESHOOTING.................................................89
<V>
VERIFYING MASTERING ..........................................88
<W>
WRIST LOAD CONDITIONS......................................45
<Z>
ZERO POSITION MASTERING..................................75
FANUC Robot M-1iA MECHANICAL UNIT操作手册 英文版.pdf
(5.87 MB, 售价: 10 E币)
【必读】版权免责声明
1、本主题所有言论和内容纯属会员个人意见,与本论坛立场无关。2、本站对所发内容真实性、客观性、可用性不做任何保证也不负任何责任,网友之间仅出于学习目的进行交流。3、对提供的数字内容不拥有任何权利,其版权归原著者拥有。请勿将该数字内容进行商业交易、转载等行为,该内容只为学习所提供,使用后发生的一切问题与本站无关。 4、本网站不保证本站提供的下载资源的准确性、安全性和完整性;同时本网站也不承担用户因使用这些下载资源对自己和他人造成任何形式的损失或伤害。 5、本网站所有软件和资料均为网友推荐收集整理而来,仅供学习用途使用,请务必下载后两小时内删除,禁止商用。6、如有侵犯你版权的,请及时联系我们(电子邮箱1370723259@qq.com)指出,本站将立即改正。
|