找回密码
 注册

QQ登录

只需一步,快速开始

搜索

FANUC Robot M-1iA MECHANICAL UNIT机械结构操作手册 英文版

[复制链接]
coolfire 发表于 2021-7-4 01:29:26 | 显示全部楼层 |阅读模式
机器人品牌
厂商: FANUC
部分内容截图:
1.png
内容索引:
<A>
A MECHANICAL UNIT EXTERNAL DIMENSIONS
AND OPERATING SPACE......................................21
AIR SUPPLY AND EE(RI) INTERFACE (OPTION) ..54
Angle of Mounting Surface Setting..................................8
Applying the Grease of the Wrist Input Gear and Drive
Shaft (M-1iA/0.5S/0.5A/0.5SL/0.5AL) (6 months
(1920 Hours) Checks).................................................71
<B>
BASIC SPECIFICATIONS ...........................................15
<C>
CAMERA CABLE (OPTION).......................................59
Check and clean the joint cover (OPTION) ...................66
CHECK POINTS ...........................................................64
Check the Connectors ....................................................67
CHECKS AND MAINTENANCE ................................60
Cleaning the Wrist Axis Rotation Parts and the Wrist
Gears (M-1iA/0.5S/0.5A/0.5SL/0.5AL) .....................66
Confirmation of Oil Seepage and Oil Accumulation .....64
Confirmation of the Air Control Set (option).................65
CONNECTION WITH THE CONTROLLER...............12
<D>
Daily Checks..................................................................60
<E>
END EFFECTOR INSTALLATION TO WRIST .........48
EQUIPMENT INSTALLATION TO THE ROBOT......48
<I>
INSTALLATION.............................................................3
INSTALLATION CONDITIONS..................................11
<J>
JOINT COVER (OPTION) ............................................52
<L>
LOAD SETTING...........................................................50
<M>
MAINTENANCE ..........................................................68
MAINTENANCE AREA...............................................11
MASTERING ................................................................73
MASTERING DATA ENTRY ......................................86
MOUNTING BOLT TORQUE LIST ..........................102
<O>
OVERVIEW ..................................................................73
<P>
Periodic Checks and Maintenance .................................61
PERIODIC MAINTENANCE TABLE..........................99
PIPING AND WIRING TO THE END EFFECTOR.....53
PREFACE.................................................................... p-1
<Q>
QUICK MASTERING...................................................79
QUICK MASTERING FOR SINGLE AXIS.................81
<R>
Replacing the Batteries (1-Year (3840 Hours) Checks
(With Stand/No Stand B)) (1.5-Year (5760 Hours)
Checks (No Stand A)) ................................................68
RESETTING ALARMS AND PREPARING FOR
MASTERING.............................................................74
Retightening the Link B.................................................65
ROBOT CONFIGURATION.........................................15
<S>
SAFETY PRECAUTIONS ...........................................s-1
SINGLE AXIS MASTERING .......................................83
STORAGE .....................................................................72
<T>
TRANSPORTATION......................................................1
TRANSPORTATION AND INSTALLATION...............1
TROUBLESHOOTING.................................................89
<V>
VERIFYING MASTERING ..........................................88
<W>
WRIST LOAD CONDITIONS......................................45
<Z>
ZERO POSITION MASTERING..................................75

FANUC Robot M-1iA MECHANICAL UNIT操作手册 英文版.pdf (5.87 MB, 售价: 10 E币)

您需要登录后才可以回帖 登录 | 注册

本版积分规则

QQ|手机版|小黑屋|ELEOK |网站地图

GMT+8, 2024-12-22 11:48

Powered by Discuz! X3.5

© 2001-2024 Discuz! Team.

快速回复 返回顶部 返回列表